Office space with obsolete equipment

It was clear that this professional office needed to prolong the life of its equipment because the price tag of replacing everything at once was prohibitive.

A long-range facilities plan to systematically replace a number of units each year along with a proactive maintenance program are bridging the gap to what could have been a major capital expense in a short period of time.

 

 
Linc Services HVAC
Case Studies
 
High energy bills, building pressure problems
The ENERGY Technologies team implemented a comprehensive maintenance plan and discovered that the outside air dampers had been...
Read more >
 
 
Manufacturing plant with frequent breakdowns and high energy bills
After an extensive analysis of the HVAC systems, several of the units were replaced and the remainder were given true preventative...
Read more >
 
 
Office space with obsolete equipment
It was clear that this professional office needed to prolong the life of its equipment because the price tag of replacing everything at once was...
Read more >
 
 
©2010 Energy Technologies, Inc. All rights reserved. info@energyt.com 800-222-1931